Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project (China)

Updated: 2014-04-01

In the Three Gorges Project, CGGC was responsible for installing all the metal structures and electromechanical equipment used for the permanent ship lock, which is of the largest scale, the most complex technology and the biggest difficulty in the world.

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project (China)

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project

 

 

 