伊人不卡,国产乱码一二三区精品,亚洲午夜综合,亚洲网站在线,亚洲国产二区三区,开心伊人网,tiantianri

 
 

Home/Our Business/Equipment Installation

Electromechanical Equipment Installation at the Shuibuya Hydropower Station (China)

Updated: 2014-04-01

CGGC installed and commissioned all the four 460MW water-turbine generator units in the underground powerhouse, the utility systems, and the water inlet and spillway metal structures of the Shuibuya Hydropower Station.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.