伊人不卡,国产乱码一二三区精品,亚洲午夜综合,亚洲网站在线,亚洲国产二区三区,开心伊人网,tiantianri

 
 

Home/Our Business/Equipment Installation

Electromechanical Equipment Installation at the Bailianhe Pumped Storage Power Station (China)

Updated: 2014-04-01

As a national key hydropower construction project in China's "11th five-year plan" period, the Bailianhe Pumped Storage Power Station is the first large-scale pumped storage power station owned by the Central China Power Grid. CGGC installed all the electromechanical equipment of this project.

Electromechanical Equipment Installation at the Bailianhe Pumped Storage Power Station (China)

Electromechanical Equipment Installation at the Bailianhe Pumped Storage Power Station

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.