伊人不卡,国产乱码一二三区精品,亚洲午夜综合,亚洲网站在线,亚洲国产二区三区,开心伊人网,tiantianri

Tunnels dug through in China-Laos Railway construction

Xinhua | Updated: 2019-04-16 11:08
Share
Share - WeChat
Staff of China Railway No 5 Engineering Group celebrate after Nateuy No 2 Tunnel of China-Laos Railway was dug through in Oudomxay Province of Laos, some 400 km north of Lao capital Vientiane, April 15, 2019. [Photo/Xinhua]

VIENTIANE - Two tunnels of the China-Laos Railway, namely Nathong No 2 and Nateuy No 2, were dug through on the same day on Monday by the constructor China Railway No 5 Engineering Group (CREC-5).

The two tunnels were located in Oudomxay Province, some 400 km north of Lao capital Vientiane.

The two tunnels, with lengths of 225 meters and 1,145 meters respectively, were dug through two months and three months ahead of schedule respectively. So far, the CREC-5 has holed through five out of the 10 tunnels in the section.

1 2 3 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US